Repowering

Repowering is replacing a project's ageing equipment with new technology on the same site, often larger or more efficient, so that the site and its connection keep operating rather than being decommissioned. It is one of three end-of-life paths, alongside refurbishment and full decommissioning, and usually needs new approvals and a renegotiated agreement with the landowner.

Why it matters for landowners

A site with a connection, access and a proven resource is valuable at the end of a project's life, which is why operators often prefer to repower rather than remove. For the owner that can mean a second term on new conditions, but only if the lease allows for it. Few existing agreements deal with repowering, and the Australian Energy Infrastructure Commissioner has called for standard clauses covering it. A lease that is silent leaves the owner negotiating from a weaker position.

Example

After twenty-five years a wind farm's turbines are worn and their model no longer made. The operator proposes replacing them with fewer, taller machines using the same substation and tracks. The lease requires the owner's consent, a new planning approval and partial decommissioning of the old foundations before the new turbines go in.

Further reading

Sources