Reference
Sources.
Every external source cited in InfraAg's articles, guides and glossary, with a link to the original and the date of the page that cites it.
InfraAg publishes no performance figures or projections of its own. Where an article uses a figure, it comes from one of the sources below, which are linked in the article and collected here. The date shown is the publication or last-review date of the page that cites the source; that is when the figure was checked.
aeic.gov.au
- Australian Energy Infrastructure Commissioner, Considerations for Landholders before entering into Commercial Agreements
Cited in Hosting energy infrastructure on farmland: solar, wind, batteries and transmission (12 November 2026), Strategic agricultural land: what it is and why it matters (12 November 2026)
- Australian Energy Infrastructure Commissioner, Position statement: Treatment of renewable energy assets at end of life
Cited in Decommissioning (12 November 2026), Lease (12 November 2026), Repowering (12 November 2026)
aemc.gov.au
- AEMC, Electricity supply chain
Cited in Distribution (12 November 2026), National Electricity Market (NEM) (12 November 2026), Substation (12 November 2026), Transmission (12 November 2026)
aemo.com.au
- AEMO, Digital demand surge: Preparing Australia's power systems for the rise of data centres, 1 June 2026
Cited in Data centres and regional land: what is being said, and what is known (25 August 2026)
- AEMO, Energy roadmap lights the way to net zero (2024 Integrated System Plan)
Cited in Transmission: why the grid has to go through farming country (13 August 2026)
- AEMO, 2026 Integrated System Plan
Cited in Hosting energy infrastructure on farmland: solar, wind, batteries and transmission (12 November 2026), Reading the Integrated System Plan: what it means for regional land (12 November 2026), Strategic agricultural land: what it is and why it matters (12 November 2026)
- AEMO, AEMO publishes least-cost pathway for the National Electricity Market
Cited in Hosting energy infrastructure on farmland: solar, wind, batteries and transmission (12 November 2026), Strategic agricultural land: what it is and why it matters (12 November 2026)
- AEMO, Integrated System Plan (ISP)
Cited in Reading the Integrated System Plan: what it means for regional land (12 November 2026)
- AEMO, ISP Methodology
Cited in Reading the Integrated System Plan: what it means for regional land (12 November 2026)
- AEMO, 2025-26 Inputs, Assumptions and Scenarios
Cited in Reading the Integrated System Plan: what it means for regional land (12 November 2026)
- Australian Energy Market Operator, Who we are
Cited in Australian Energy Market Operator (12 November 2026)
- Australian Energy Market Operator, Corporate governance
Cited in Australian Energy Market Operator (12 November 2026)
- AEMO, Integrated System Plan (ISP)
Cited in Battery energy storage system (BESS) (12 November 2026), Firming (12 November 2026), Integrated System Plan (ISP) (12 November 2026), Pumped hydro (12 November 2026), Renewable Energy Zone (REZ) (12 November 2026), Transmission (12 November 2026)
- AEMO, Generation information
Cited in Capacity factor (12 November 2026), Megawatt (MW) (12 November 2026)
- AEMO, Network connections
Cited in Connection (12 November 2026)
- AEMO, Transmission and distribution in the NEM: process overview
Cited in Connection (12 November 2026)
- Australian Energy Market Operator, Network connections: contracts
Cited in Connection agreement (12 November 2026)
- Australian Energy Market Operator, Network connections
Cited in Connection agreement (12 November 2026)
- AEMO, Enhanced Locational Information (ELI)
Cited in Curtailment (12 November 2026), Hosting capacity (12 November 2026), Hybrid or co-located (12 November 2026)
- AEMO, AEMO provides locational insights to inform investment in the NEM
Cited in Curtailment (12 November 2026)
- AEMO, 2026 Integrated System Plan (ISP)
Cited in Firming (12 November 2026), Integrated System Plan (ISP) (12 November 2026)
- Australian Energy Market Operator, Electricity market participants
Cited in Generator (12 November 2026)
- Australian Energy Market Operator, Application guide for registration as a Generator or Integrated Resource Provider
Cited in Generator (12 November 2026), Nameplate capacity (12 November 2026)
- AEMO, 2024 Enhanced Locational Information Report, Appendix 2: Indicator definitions and methodology
Cited in Hosting capacity (12 November 2026)
- AEMO, Registering a Hybrid System in the NEM: fact sheet
Cited in Hybrid or co-located (12 November 2026)
- AEMO, About the National Electricity Market (NEM)
Cited in Megawatt hour (MWh) (12 November 2026), National Electricity Market (NEM) (12 November 2026)
- Australian Energy Market Operator, Generation information
Cited in Nameplate capacity (12 November 2026)
- Australian Energy Market Operator, Transmission and distribution in the NEM
Cited in Network service provider (12 November 2026)
aer.gov.au
- Australian Energy Regulator, Guidelines to make the Integrated System Plan actionable
Cited in Reading the Integrated System Plan: what it means for regional land (12 November 2026)
- AER, Networks
Cited in Distribution (12 November 2026), Substation (12 November 2026)
- AER, Glossary
Cited in Megawatt (MW) (12 November 2026), Megawatt hour (MWh) (12 November 2026)
- Australian Energy Regulator, Networks guidelines, schemes, models and reviews
Cited in Network service provider (12 November 2026)
ag.gov.au
- Attorney-General's Department, Native title
Cited in Native title (12 November 2026)
agriculture.gov.au
- ABARES, Snapshot of Australian Agriculture 2026
Cited in Why good agricultural land is scarce (4 November 2026), Australia feeds far more people than live here (9 September 2026), Transmission: why the grid has to go through farming country (13 August 2026), Two needs, one paddock (30 June 2026)
- ABARES, Snapshot of Australian Agriculture 2026
Cited in How Australian agricultural land is owned, leased and valued (12 November 2026), Strategic agricultural land: what it is and why it matters (12 November 2026), The landlord model: owning agricultural land without operating it (12 November 2026)
- ABARES, Land use of Australia 2010–11 to 2020–21 version 7.1
Cited in How Australian agricultural land is owned, leased and valued (12 November 2026), Natural capital on working land: carbon, biodiversity and what they ask of an owner (12 November 2026), Strategic agricultural land: what it is and why it matters (12 November 2026), Dryland farming (12 November 2026)
- Department of Agriculture, Fisheries and Forestry, Carbon Farming Outreach Program: planning for carbon farming
Cited in Natural capital on working land: carbon, biodiversity and what they ask of an owner (12 November 2026)
- Department of Agriculture, Fisheries and Forestry, Delivering Ag2030
Cited in Strategic agricultural land: what it is and why it matters (12 November 2026)
- Department of Agriculture, Fisheries and Forestry, Carbon Farming Outreach Program glossary
Cited in Baseline (12 November 2026), Monitoring, reporting and verification (12 November 2026)
- ABARES, Farm surveys definitions and methods
Cited in Broadacre cropping (12 November 2026)
- ABARES, Financial performance of cropping farms
Cited in Broadacre cropping (12 November 2026)
- Department of Agriculture, Fisheries and Forestry, Carbon Farming Outreach Program
Cited in Carbon farming (12 November 2026)
- Department of Agriculture, Fisheries and Forestry, Carbon farming reduces emissions, stores carbon
Cited in Carbon farming (12 November 2026)
- Department of Agriculture, Fisheries and Forestry, Carbon farming activities and co-benefits
Cited in Co-benefit (12 November 2026)
- ABARES, Land use
Cited in Dryland farming (12 November 2026), Improved pasture (12 November 2026), Irrigated land (12 November 2026)
api.org.au
arena.gov.au
- ARENA, What is battery storage?
Cited in Battery energy storage system (BESS) (12 November 2026)
- ARENA, Hydropower and pumped hydro energy storage
Cited in Pumped hydro (12 November 2026)
arr.news
ato.gov.au
bom.gov.au
- Bureau of Meteorology, Drought
Cited in Drought (12 November 2026)
- Bureau of Meteorology, Drought knowledge centre
Cited in Drought (12 November 2026)
- Bureau of Meteorology, Rainfall variability maps
Cited in Rainfall reliability (12 November 2026), Tablelands (12 November 2026)
- Bureau of Meteorology, About Australian climate averages: rainfall variability
Cited in Rainfall reliability (12 November 2026)
cer.gov.au
- Clean Energy Regulator, Australian Carbon Credit Unit Scheme
Cited in Natural capital on working land: carbon, biodiversity and what they ask of an owner (12 November 2026), Australian Carbon Credit Unit (ACCU) (12 November 2026), Carbon project (12 November 2026), Permanence period (12 November 2026)
- Clean Energy Regulator, ACCU Scheme methods
Cited in Natural capital on working land: carbon, biodiversity and what they ask of an owner (12 November 2026)
- Clean Energy Regulator, Closed methods
Cited in Natural capital on working land: carbon, biodiversity and what they ask of an owner (12 November 2026), Human-induced regeneration (12 November 2026)
- Clean Energy Regulator, Human-induced regeneration of a permanent even-aged native forest method (closed)
Cited in Natural capital on working land: carbon, biodiversity and what they ask of an owner (12 November 2026), Human-induced regeneration (12 November 2026)
- Clean Energy Regulator, Permanence obligations
Cited in Natural capital on working land: carbon, biodiversity and what they ask of an owner (12 November 2026), The landlord model: owning agricultural land without operating it (12 November 2026)
- Clean Energy Regulator, Selling or buying ACCU Scheme project property
Cited in Natural capital on working land: carbon, biodiversity and what they ask of an owner (12 November 2026), The landlord model: owning agricultural land without operating it (12 November 2026)
- Clean Energy Regulator, Nature Repair Market scheme
Cited in Natural capital on working land: carbon, biodiversity and what they ask of an owner (12 November 2026), Nature Repair Market (12 November 2026)
- Clean Energy Regulator, How to participate in the Nature Repair Market scheme
Cited in Natural capital on working land: carbon, biodiversity and what they ask of an owner (12 November 2026)
- Clean Energy Regulator, Biodiversity certificates
Cited in Natural capital on working land: carbon, biodiversity and what they ask of an owner (12 November 2026)
- Clean Energy Regulator, 2024–25 Safeguard preliminary insights
Cited in Natural capital on working land: carbon, biodiversity and what they ask of an owner (12 November 2026)
- Clean Energy Regulator, Newness, regulatory additionality and government program requirements
Cited in Additionality (12 November 2026)
- Clean Energy Regulator, Eligibility for the ACCU Scheme
Cited in Additionality (12 November 2026)
- Clean Energy Regulator, Permanence obligations
Cited in Australian Carbon Credit Unit (ACCU) (12 November 2026), Permanence period (12 November 2026)
- Clean Energy Regulator, Safeguard baselines
Cited in Baseline (12 November 2026)
- Clean Energy Regulator, Nature Repair Market scheme
Cited in Biodiversity certificate (12 November 2026)
- Clean Energy Regulator, How to participate in the ACCU Scheme
Cited in Carbon project (12 November 2026)
- Clean Energy Regulator, Reforestation by environmental or mallee plantings FullCAM method 2024
Cited in Environmental planting (12 November 2026)
- Clean Energy Regulator, New reforestation by environmental or mallee plantings FullCAM method
Cited in Environmental planting (12 November 2026)
- Clean Energy Regulator, Project reporting and audits
Cited in Monitoring, reporting and verification (12 November 2026)
- Clean Energy Regulator, Safeguard Mechanism
Cited in Safeguard Mechanism (12 November 2026)
- Clean Energy Regulator, Estimating soil organic carbon sequestration using measurement and models method
Cited in Soil carbon (12 November 2026)
- Clean Energy Regulator, Understanding your soil carbon project
Cited in Soil carbon (12 November 2026)
cleanenergycouncil.org.au
- Clean Energy Council, Agrisolar
Cited in Hosting energy infrastructure on farmland: solar, wind, batteries and transmission (12 November 2026), Strategic agricultural land: what it is and why it matters (12 November 2026)
- Clean Energy Council, Examples of agriculture and co-land use: case studies from 2025 Best Practice Charter reports
Cited in Hosting energy infrastructure on farmland: solar, wind, batteries and transmission (12 November 2026)
consult.dcceew.gov.au
crownland.nsw.gov.au
- NSW Crown Lands, Western lands lease
Cited in How Australian agricultural land is owned, leased and valued (12 November 2026)
- NSW Crown Lands, What is Crown land?
Cited in Crown land (12 November 2026)
- NSW Crown Lands, Using Crown land
Cited in Crown land (12 November 2026)
- NSW Crown Lands, Western lands
Cited in Freehold (12 November 2026), Leasehold (12 November 2026)
- NSW Crown Lands, Leases overview
Cited in Leasehold (12 November 2026)
- NSW Crown Lands, Travelling stock reserves
Cited in Travelling stock reserve (12 November 2026)
csiro.au
- CSIRO, GenCost 2024-25: Final report
Cited in Capacity factor (12 November 2026)
data.nsw.gov.au
- NSW Government, Land and Soil Capability Mapping for NSW
Cited in Land and soil capability class (12 November 2026)
dcceew.gov.au
- Department of Climate Change, Energy, the Environment and Water, Nature Repair Market
Cited in Natural capital on working land: carbon, biodiversity and what they ask of an owner (12 November 2026), Biodiversity certificate (12 November 2026), Nature Repair Market (12 November 2026)
- Department of Climate Change, Energy, the Environment and Water, Nature Repair Market legislation
Cited in Natural capital on working land: carbon, biodiversity and what they ask of an owner (12 November 2026)
- Department of Climate Change, Energy, the Environment and Water, Safeguard Mechanism overview
Cited in Natural capital on working land: carbon, biodiversity and what they ask of an owner (12 November 2026)
- Department of Climate Change, Energy, the Environment and Water, Natural Capital Accounts
Cited in Natural capital (12 November 2026), Natural capital accounting (12 November 2026)
- Department of Climate Change, Energy, the Environment and Water, Natural Capital Accounts work program
Cited in Natural capital accounting (12 November 2026)
- Department of Climate Change, Energy, the Environment and Water, Safeguard Mechanism
Cited in Safeguard Mechanism (12 November 2026)
dpi.nsw.gov.au
- NSW Department of Primary Industries, NLIS cattle: agistment requirements
Cited in Agistment (12 November 2026)
- NSW Department of Primary Industries, PROGRAZE manual
Cited in Carrying capacity (12 November 2026)
- NSW Department of Primary Industries, Managing native pastures
Cited in Native pasture (12 November 2026)
dpird.nsw.gov.au
- NSW Department of Primary Industries and Regional Development, General biosecurity duty
Cited in Biosecurity plan (12 November 2026)
- NSW Department of Primary Industries and Regional Development, Using DSEs and carrying capacities to compare sheep enterprises
Cited in Dry sheep equivalent (12 November 2026)
- NSW Department of Primary Industries and Regional Development, Pasture establishment and management
Cited in Improved pasture (12 November 2026)
energyco.nsw.gov.au
- EnergyCo, Our projects
Cited in Rocky Creek: an introduction (18 November 2026)
- EnergyCo, Explainer: NSW renewable energy transmission towers and land use
Cited in Hosting energy infrastructure on farmland: solar, wind, batteries and transmission (12 November 2026), Transmission (12 November 2026)
- EnergyCo, Strategic Benefit Payments Scheme explained
Cited in Hosting energy infrastructure on farmland: solar, wind, batteries and transmission (12 November 2026)
- EnergyCo NSW, EnergyCo
Cited in Reading the Integrated System Plan: what it means for regional land (12 November 2026)
- EnergyCo, Strategic Benefit Payments Scheme explained
Cited in Compensation (12 November 2026)
- EnergyCo NSW, Living and working near transmission line easements
Cited in Easement (12 November 2026)
- EnergyCo NSW, Information for landholders
Cited in Easement (12 November 2026), Host (12 November 2026)
- EnergyCo NSW, What's a renewable energy zone?
Cited in Renewable Energy Zone (REZ) (12 November 2026)
energynetworks.com.au
- AEMO, 2026 Integrated System Plan, as reported by Energy Networks Australia and CommBank Newsroom
Cited in Transmission: why the grid has to go through farming country (13 August 2026), Two needs, one paddock (30 June 2026), Reading the Integrated System Plan: what it means for regional land (12 November 2026)
environment.nsw.gov.au
- NSW Department of Climate Change, Energy, the Environment and Water, Generate and sell biodiversity credits
Cited in Natural capital on working land: carbon, biodiversity and what they ask of an owner (12 November 2026), The landlord model: owning agricultural land without operating it (12 November 2026), Biodiversity credit (12 November 2026)
- NSW Department of Climate Change, Energy, the Environment and Water, The Biodiversity Offsets Scheme
Cited in Biodiversity credit (12 November 2026)
- NSW Department of Climate Change, Energy, the Environment and Water, Biodiversity stewardship agreements
Cited in Biodiversity stewardship agreement (12 November 2026)
foreigninvestment.gov.au
legislation.nsw.gov.au
- NSW legislation, Agricultural Tenancies Act 1990
Cited in Agricultural lease (12 November 2026)
- NSW legislation, Land Acquisition (Just Terms Compensation) Act 1991
Cited in Compensation (12 November 2026)
legislation.qld.gov.au
nativetitle.org.au
- AIATSIS, Native title, rights and interests
Cited in How Australian agricultural land is owned, leased and valued (12 November 2026)
nff.org.au
nntt.gov.au
- National Native Title Tribunal, About native title applications
Cited in Native title (12 November 2026)
nsw.gov.au
- NSW Government, Agricultural tenancies
Cited in How Australian agricultural land is owned, leased and valued (12 November 2026), The landlord model: owning agricultural land without operating it (12 November 2026), Agricultural lease (12 November 2026)
- NSW Valuer General, How land is valued in NSW
Cited in How Australian agricultural land is owned, leased and valued (12 November 2026), Rural property valuation (12 November 2026)
- NSW Government, Compare and apply for a conservation agreement
Cited in Natural capital on working land: carbon, biodiversity and what they ask of an owner (12 November 2026)
- NSW Government, Meeting your General Biosecurity Duty
Cited in Natural capital on working land: carbon, biodiversity and what they ask of an owner (12 November 2026), The landlord model: owning agricultural land without operating it (12 November 2026)
- NSW Government, Biosecurity for absentee landholders
Cited in The landlord model: owning agricultural land without operating it (12 November 2026)
- NSW Government, Local Land Services
Cited in The landlord model: owning agricultural land without operating it (12 November 2026)
- NSW Government, Calculating stocking rates
Cited in Adult equivalent (12 November 2026), Carrying capacity (12 November 2026), Dry sheep equivalent (12 November 2026)
- NSW Government, Agistment for livestock
Cited in Agistment (12 November 2026)
- NSW Biodiversity Conservation Trust, Guideline for Biodiversity Stewardship Agreement sites
Cited in Biodiversity stewardship agreement (12 November 2026)
- NSW Government, On-farm biosecurity planning tips
Cited in Biosecurity plan (12 November 2026)
- NSW Government, The Valuer General's role in compulsory acquisitions
Cited in Compensation (12 November 2026)
- NSW Government, Conveyancing for property buyers and sellers
Cited in Due diligence (12 November 2026)
- NSW Government, Native pastures
Cited in Native pasture (12 November 2026)
- NSW Government, Objecting to different property types
Cited in Rural property valuation (12 November 2026)
- NSW Government, Local Land Services, Northern Tablelands regional profile
Cited in Tablelands (12 November 2026)
- NSW Government, Travelling stock reserves
Cited in Travelling stock reserve (12 November 2026)
nswlrs.com.au
- NSW Land Registry Services, Land ownership
Cited in Freehold (12 November 2026), Lot and deposited plan (12 November 2026)
online.nswlrs.com.au
- NSW Land Registry Services, NSW LRS Online
Cited in Due diligence (12 November 2026), Lot and deposited plan (12 November 2026)
planning.nsw.gov.au
- NSW Department of Planning, Housing and Infrastructure, Renewable Energy Planning Framework
Cited in Hosting energy infrastructure on farmland: solar, wind, batteries and transmission (12 November 2026)
- NSW Department of Planning, Housing and Infrastructure, Large-Scale Solar Energy Guideline
Cited in Hosting energy infrastructure on farmland: solar, wind, batteries and transmission (12 November 2026), Strategic agricultural land: what it is and why it matters (12 November 2026), Decommissioning (12 November 2026), Make-good obligation (12 November 2026), Solar farm (12 November 2026)
- NSW Department of Planning, Housing and Infrastructure, Benefit-Sharing Guideline
Cited in Hosting energy infrastructure on farmland: solar, wind, batteries and transmission (12 November 2026), Benefit sharing (12 November 2026)
- NSW Department of Planning, Housing and Infrastructure, Private Agreement Guideline
Cited in Hosting energy infrastructure on farmland: solar, wind, batteries and transmission (12 November 2026), Access agreement (12 November 2026), Host (12 November 2026), Lease (12 November 2026), Neighbour agreement (12 November 2026), Option (12 November 2026)
- NSW Department of Planning, Housing and Infrastructure, Renewable Energy Planning Framework
Cited in How Australian agricultural land is owned, leased and valued (12 November 2026), Reading the Integrated System Plan: what it means for regional land (12 November 2026)
- NSW Department of Planning, Housing and Infrastructure, Safeguarding our agricultural land
Cited in Strategic agricultural land: what it is and why it matters (12 November 2026)
- NSW Department of Planning, Housing and Infrastructure, Renewable Energy Planning Framework
Cited in Access agreement (12 November 2026)
- NSW Department of Planning, Housing and Infrastructure, Renewable Energy Planning Framework
Cited in Benefit sharing (12 November 2026), Neighbour agreement (12 November 2026), Solar farm (12 November 2026), State Significant Development (SSD) (12 November 2026), Wind farm (12 November 2026)
- NSW Department of Planning, Housing and Infrastructure, Overview of the Renewable Energy Planning Framework
Cited in Make-good obligation (12 November 2026)
- NSW Department of Planning, Housing and Infrastructure, Wind Energy Guideline
Cited in Repowering (12 November 2026), Wind farm (12 November 2026)
- NSW Department of Planning, Housing and Infrastructure, State significant development
Cited in State Significant Development (SSD) (12 November 2026)
planning.qld.gov.au
- Queensland Government, Areas of regional interest
Cited in Strategic agricultural land: what it is and why it matters (12 November 2026)
planning.vic.gov.au
premier.vic.gov.au
pv-tech.org
qld.gov.au
re100.eng.anu.edu.au
reneweconomy.com.au
soe.dcceew.gov.au
transgrid.com.au
- Transgrid, Easement guidelines
Cited in Hosting energy infrastructure on farmland: solar, wind, batteries and transmission (12 November 2026)
w.media
water.dcceew.nsw.gov.au
- NSW Department of Climate Change, Energy, the Environment and Water, Basic landholder rights bore
Cited in Bore (12 November 2026)
- NSW Department of Climate Change, Energy, the Environment and Water, An introduction to basic landholder rights
Cited in Bore (12 November 2026)
- NSW Department of Climate Change, Energy, the Environment and Water, Harvestable rights
Cited in Farm dam (12 November 2026)
- NSW Department of Climate Change, Energy, the Environment and Water, Dams
Cited in Farm dam (12 November 2026)
- NSW Department of Climate Change, Energy, the Environment and Water, An introduction to water allocations
Cited in Irrigated land (12 November 2026), Water allocation (12 November 2026), Water entitlement (12 November 2026)
- NSW Department of Climate Change, Energy, the Environment and Water, How water is allocated
Cited in Water allocation (12 November 2026), Water entitlement (12 November 2026)