Hosting energy infrastructure on farmland: solar, wind, batteries and transmission

Australia's electricity system is growing, and most of the new generation, storage and transmission that growth needs will be built in the regions, much of it on or across farming land. For a landowner, the four kinds of infrastructure most likely to arrive are large-scale solar, wind, grid-scale batteries and high-voltage transmission. They are very different propositions. This guide sets out what each one takes from a property, what each needs from a site, how projects are approved, what a host agrees to and what should be settled before anything is signed. It is general information, not legal or financial advice, and a landowner considering an agreement should take independent advice.

What kinds of energy infrastructure are built on farmland?

Four kinds, in the main: solar farms, wind farms, battery energy storage systems and transmission lines. Each is built by a different kind of organisation and arrives on a property in a different way.

A solar farm is rows of panels on frames, with inverters, a small substation and a fence around the whole. A wind farm is a set of turbines spread across a wide area, each on a concrete foundation, linked by underground cables and access roads to a substation. A battery energy storage system, usually shortened to BESS, is a fenced compound of containerised battery units, inverters and transformers beside a connection to the network. A transmission line is a run of towers and conductors crossing many properties to link generation to the grid or to strengthen the grid itself, carried on an easement registered on each title.

Solar, wind and batteries are built by developers who approach a landowner and negotiate a private agreement. Transmission is built by network operators with powers of compulsory acquisition, under a public planning process, so the landowner's position is different from the start. Projects are increasingly hybrid or co-located: a battery beside a solar farm, or wind and solar sharing a connection.

The scale of what is planned is large. The Australian Energy Market Operator's 2026 Integrated System Plan describes a least-cost path to 2050 with almost 120 gigawatts of utility-scale wind and solar, about five times today's level, almost 50 gigawatts of utility-scale storage and hydro, and about 6,000 kilometres of new transmission on an existing network of about 44,000 kilometres.

How much land does each technology take, and can farming continue?

It depends on the technology more than on anything else. Wind and transmission leave almost all the ground in production. Solar takes its fenced area, though sheep can often graze it. A battery takes a small site outright.

Technology Area it spans Area it occupies What farming continues Main lasting change
Transmission A strip, around 70 metres wide on major NSW lines, across the length of the property Tower footings and access tracks Grazing under the line; cropping with limits on tall machinery and structures A registered easement with restrictions on buildings, trees and some activities
Wind Many hundreds of hectares between turbines Turbines, hardstands, roads and a substation, about 2% of a site in Clean Energy Council case studies Grazing and cropping to the base of the towers New all-weather roads across paddocks; limits on aerial work near turbines
Solar The fenced array, usually tens to hundreds of hectares The whole fenced area Sheep grazing between and beneath panels; not cattle at standard panel heights; no broadacre cropping The site is managed as a solar paddock
Battery A few hectares The whole compound None inside the fence An industrial site with permanent access, noise and fire management requirements

Transmission changes less for a grazing property than people expect. Stock graze under the line, the footprint of the towers is small, and the restrictions are mainly on structures, tall machinery and some activities within the easement. EnergyCo, the NSW agency planning new lines, describes the easements for its major projects as around 70 metres wide but variable, and says landowners keep ownership and can continue farming. For cropping and irrigation the effect is greater, because towers interrupt machinery runs and aerial operations. Transgrid's easement guidelines set out which activities are permitted, which need approval and which are prohibited, and development within an easement needs the network operator's authorisation.

Wind spans a large area and occupies very little of it. In the Clean Energy Council's published case studies, turbines, hardstands and access roads take about 2% of a project site, with grazing and cropping continuing up to the edge of that infrastructure. The lasting change is the roads: built for heavy loads, they cut across paddocks and alter drainage, and the landowner should have a say in where they go. Fencing and water often need re-planning, and aerial spreading, spraying and mustering are restricted near turbines.

Solar is the most land-intensive per unit of capacity, because it takes its whole fenced area. The Clean Energy Council records that the first Australian solar farm to graze sheep was Royalla, near Canberra, in 2015, and that more than a dozen solar farms have since done the same. Standard panel heights suit sheep. Cattle are larger and harder on equipment, so on cattle country the solar area usually comes out of the grazing operation. Broadacre cropping among standard arrays is not practical. The Council has estimated that the large-scale solar AEMO expects New South Wales to need by 2050 would occupy about 40,000 hectares, which it puts at 0.06% of the state's rural land.

A battery is the smallest in area and the least like farming. A compound is a fenced hardstand with access roads, drainage and a buffer around it. There is no grazing inside the fence, so the question for the property is which piece of ground to give up, not how two uses share it.

What does each technology need from a site?

Each looks for something different, and the strength of the nearby network matters to all of them. A property that suits a battery may not suit a wind farm, and the reverse.

Technology What it needs most Also needs Where it is usually sited
Solar Flat to gently sloping cleared land with good sun A connection with spare hosting capacity nearby; access for construction; low flood and bushfire risk Within a short distance of a substation or line
Wind A consistent wind resource, usually on ridges or open plains Space to separate turbines from houses; access roads able to carry oversized loads; a connection Elevated or exposed country, often with neighbours affected by views and noise
Battery A strong connection to the grid A few hectares of stable ground; all-weather access; separation from houses for noise and fire Beside substations and major lines, often next to existing or planned generation
Transmission A corridor between the places power is made and used Easements across every property on the route; construction access Follows existing easements, boundaries and less productive ground where it can; cannot avoid farms altogether

A battery does not need wind or sun. It needs a strong connection, which makes its siting almost entirely a matter of what the network looks like nearby. Solar and wind need both a resource and a connection, so a good wind site with no network nearby is of little use until the network arrives.

Transmission cuts both ways. A line across a property is a burden. A strong network nearby is also the thing that makes other uses possible, because generation and storage look first at land close to capable network.

How are projects approved?

Large projects are approved by state planning departments, not local councils, under rules that are specific to each technology. In New South Wales, large solar, wind, battery and transmission projects are assessed as State Significant Development or State Significant Infrastructure, with an environmental impact statement, public exhibition and conditions of consent.

The NSW Renewable Energy Planning Framework, published in November 2024, sets out how that assessment works. It contains a Wind Energy Guideline with technical supplements on visual impact and noise, a Large-Scale Solar Energy Guideline with a visual supplement, a Transmission Guideline, a Benefit-Sharing Guideline and a Private Agreement Guideline, together with decommissioning calculators for each technology.

The solar guideline matters most to landowners with good farmland. It requires applicants to assess impacts on agricultural land, treats land mapped as Biophysical Strategic Agricultural Land or rated in Land and Soil Capability classes 1 to 3 as important agricultural land, and sets out principles that steer development toward land with limited agricultural productivity. It also includes guidance to ensure the land goes back to its previous use after decommissioning.

The Benefit-Sharing Guideline sets an expectation that projects contribute to the communities around them. For wind it states an expected rate of $1,050 per megawatt of capacity each year. The Private Agreement Guideline covers the two most common arrangements, host agreements and neighbour agreements, and lists the land-use matters they should deal with, including agriculture, fire management and seasonal protocols around calving, lambing, sowing and harvest.

What agreements does a host landowner sign?

Usually two, in sequence: an option, then a lease or easement. The option gives a developer the right, for a period of years, to investigate the site and, if the project proceeds, to require the landowner to grant the lease. The lease is the long one.

The Australian Energy Infrastructure Commissioner describes the lease, or host agreement, as a complex commercial lease that commits the landholder for a very long time and places significant obligations on them. Its guidance for landholders lists the matters to look at before signing, among them:

  • the term of the agreement, extension clauses and whether the landholder can end it;
  • binding clauses that require the landholder to enter later agreements on terms set now;
  • what land is taken, for how long, and what access the project has across the rest of the property;
  • what is paid, how it is calculated and how it changes over time;
  • restrictions on further development, sale or subdivision of the property;
  • who carries which risks and insurance;
  • who removes the equipment and restores the site at the end.

The Commissioner strongly encourages landholders to obtain independent legal, financial, valuation and insurance advice before signing anything. For wind in particular, the final number and position of turbines is often not known when an option is signed, and fewer turbines than first proposed means lower payments than expected. That should be dealt with expressly.

Neighbours have agreements too. The NSW framework expects developers to reach neighbour agreements where a project affects adjoining land in ways that cannot otherwise be managed. For a host, the neighbours are not someone else's concern. They will still be there in thirty years.

What are landholders paid for transmission?

Compensation for the easement, and in New South Wales and Victoria a separate annual payment on top of it. Transmission is different from generation because the network operator can acquire the easement compulsorily, so compensation is set by acquisition law rather than open negotiation, and two states have added scheme payments to recognise hosts.

In New South Wales, the Strategic Benefit Payments Scheme pays eligible landholders the equivalent of $200,000 in 2022 dollars per kilometre of eligible high-voltage line hosted, in annual instalments over 20 years, indexed to inflation. EnergyCo states that the first payment is made within 90 days of the line being energised and that the payments do not reduce the compensation paid for the easement itself.

In Victoria, the government announced in February 2023 that landholders hosting new transmission easements would receive a standard rate of $8,000 per kilometre hosted per year for 25 years, starting with the VNI West and Western Renewables Link corridors and extending to later projects. The announcement describes these as additional payments.

The amounts and eligibility rules are set by each scheme and change over time, so the current published terms should be checked before relying on them.

What happens at the end of a project's life?

The equipment is removed and the land is restored, if the agreement and the planning conditions say so clearly and someone is bound to pay for it. Decommissioning is the part of a hosting arrangement most often left vague at the start, and the most expensive to get wrong.

At the end of a consent, the operator may seek to repower the site with new equipment, extend the consent, or decommission. Wind foundations and turbine components are large, and removing them is a significant job. The NSW framework includes decommissioning calculators for wind, solar and transmission so that the likely cost can be estimated during assessment, and the solar guideline includes guidance on ensuring the land goes back to its previous use.

For the landowner, the questions to settle at the start are what comes back, in what condition, who does the work, and what security stands behind the obligation if the operator is no longer there.

What should an owner think about before saying yes?

Whether the farm can spare the ground, whether the project suits the land and the district, and whether the terms settle the things that will matter in thirty years.

A few questions that tend to separate good arrangements from poor ones:

  • Which land, exactly? The land the farm can best spare, not the best paddocks. Where roads, cables and the compound go should be the owner's decision as much as the developer's.
  • What does the operator need? If the land is leased to a farming operator, their stock, water, fencing and access all change. They should be in the conversation early, and the hosting agreement and the farm lease should fit each other.
  • What do the neighbours see and hear? Wind and batteries in particular affect people beyond the boundary. Telling them early is both decent and practical.
  • What happens in construction? A year or more of earthworks, heavy vehicles, open gates and biosecurity risk, all to be agreed before the first truck arrives.
  • What is left at the end? Removal, restoration and security for both.

Energy security and food security meet on properties like these. The country needs both. An owner who understands the farm, understands what is being proposed and holds the land for the long term is in the best position to make sure neither is given up for the other.